The project is an elevated frame-type station above the public corridor. The high-formwork system needs modular scaffolding to support 9.6m above the ground level.
The structure of elevated frame-type is 93m in width and 128m in length.
The structural main-beam on the bridge pier is 1m in width and 2.4m in height. And the structural sub-beam is 0.6m in width and 1.8m in height.
The designed modular scaffolding is required to provide the personnel access for construction operators. It has been created by more than 10 scaffolders, with additional support by management and supervisors.